The students are at home, and thus It is much quieter in Chisomo. And it has already rained a few times since last week, that is, that the seeds come up. This next week!
Today, it is to go again for the building industry, because there has enormously been busy since the last entry in this regard:
After the floor slab was poured, it went to the walls. This was the status of 26 November.
On 29 November were already walled in the window frames.
And yesterday, on 6 December was, of gables and other exterior walls of the room increase.
morning, on Wednesday, will be the first part of the roof can be lifted so that the walls can be increased by four rows of cement block. This will be a ticklish thing, because right now it looks like rain every day. When the roof is gone, it is determined to go three or four days until the new back on it is.
Thank you, if you there to pray, it does not rain too much in!
Now two images from the Maurer life in Malawi:
This is our "Concrete", his name is Eric.
where he works as a "stone saw," with a machete - in deft stroke technique!
Love,
Daniel.
0 comments:
Post a Comment